New Dental Office IT Setup & Buildout

Opening a dental practice involves hundreds of decisions. Technology can easily become something everyone plans to finish later. That’s usually where expensive compromises begin.

The goal is not to get the computers installed before opening day. It is to open with an environment that has been planned, connected, secured, tested, documented, and prepared for recovery before the first patient arrives.

Your dental office buildout

Opening readiness checklist

Mark what is already decided. This stays in this browser only. It is a project tracker, not a compliance or risk score.

Buildout readiness: 0 of 17 items planned

Construction
Connectivity
Dental systems
Infrastructure
Security & recovery
Opening readiness

Plan the technology before the walls close

Construction. Equipment. Financing. Staffing. Practice-management software. Imaging. Phones. Internet. Computers. Cybersecurity. Backup. Vendors. A buyer who is 90 to 180 days from opening is coordinating all of that at once. Mistakes made now are expensive after walls, cabinetry, and clinical equipment are installed.

A new dental practice may depend on technology for scheduling, charting, imaging, claims, phones, email, and recovery. These are not independent systems. The imaging workstation depends on the network. Practice-management software may depend on a server or a cloud connection. Phones may depend on Internet service. Backup depends on knowing where the data actually lives.

  • Patient scheduling
  • Charting
  • Digital X-rays
  • CBCT
  • Intraoral imaging
  • Scanners
  • Treatment planning
  • Insurance
  • Claims
  • Payments
  • Phones
  • Email
  • Patient communication
  • Cybersecurity
  • Backup and recovery

Open with a technology environment that has been planned, connected, secured, tested, documented, and prepared for recovery before the first patient arrives.

Opening a dental office in Dallas–Fort Worth? 323 Technologies can help coordinate the technology layer of the project from floor plan through opening day.

Schedule a Dental Office IT Planning Session

Start with the floor plan, not the computer order

Before choosing computers, walk through the floor plan room by room and ask what technology will be used there. The answers determine cabling, power, networking, workstation requirements, displays, printers, phones, imaging, and vendor dependencies.

Don’t let these decisions get made by whichever vendor arrives first. Plan for opening day and reasonable future expansion. Running an extra cable while the walls are open is substantially easier than adding it after cabinetry and clinical equipment are installed.

Front desk technology

  • Workstations
  • Monitors
  • VoIP phones
  • Document scanners
  • Printers
  • Label printers
  • Payment terminals
  • Signature devices
  • Patient check-in hardware
  • Network connections
  • Power

How many people will work simultaneously? Will every workstation be wired? Where will shared printers live? Are payment terminals Ethernet, Wi-Fi, or workstation-connected? Is the front desk responsible for scanning documents? Does patient check-in require its own hardware?

Operatory technology

  • Workstation
  • Display
  • Network connection
  • Phone
  • Intraoral sensor
  • Intraoral camera
  • Imaging access
  • USB-connected equipment
  • Treatment-presentation display
  • Future clinical equipment

Imaging and CBCT

Clinical imaging deserves its own design discussion. The environment might include DEXIS, intraoral sensors, panoramic imaging, CBCT, intraoral cameras, image-acquisition workstations, scanners, and treatment-planning systems.

Determine workstation specifications, where the acquisition workstation sits, where images are stored, network and USB requirements, vendor installation requirements, practice-management integration, and backup. Do not assume that PMS hardware requirements automatically cover imaging workloads.

Related: DEXIS support

3Shape and digital dentistry

A digital workflow can add a scanning workstation, CPU and GPU requirements, RAM, display, USB, cloud connectivity, storage, vendor software, and network performance. Plan that before purchasing generic office PCs.

Related: 3Shape support

Choose the practice-management platform early

One of the most important early decisions is what system will run the practice. Common options include Dentrix, Eaglesoft, Open Dental, and cloud-based platforms. That choice can affect server design, workstation requirements, Windows versions, database architecture, Internet dependency, networking, imaging, backup, and vendor installation.

Don’t buy the infrastructure first and discover compatibility requirements later. Design against the current vendor requirements for the exact version you will install.

Planning for Dentrix

Dentrix’s current 2026 specifications call for gigabit networking and specify Windows Server editions for servers and Windows workstations. They also warn that application workload and third-party products can increase hardware requirements beyond the minimums.

Determine the exact Dentrix release, server requirements, workstation count, imaging integrations, storage, backup method, vendor installation date, and Windows compatibility. Do not size a new dental office around obsolete Dentrix requirements. Current Dentrix 2026 workstation guidance describes 8 GB as minimum RAM and 16 GB as recommended, while emphasizing that other applications may increase that.

Related: Dentrix support

Planning for Eaglesoft

Review the current Patterson Dental requirements before hardware procurement. Current Patterson Dental guidance recommends a dedicated Eaglesoft server starting at six or more workstations and increases server requirements as the workstation count grows. That guidance also includes gigabit networking, server UPS recommendations, imaging considerations, antivirus and firewall guidance, and backup requirements.

Determine the Eaglesoft version, workstation count, server design, Windows requirements, imaging, Schick or other digital integrations, storage, network, backup, and the vendor installation sequence.

Related: Eaglesoft support

Planning for Open Dental

Open Dental uses MySQL or MariaDB for its database layer and recommends a dedicated server to help protect data. It also supports virtualized environments, but warns that shared host workloads can degrade database performance. Its August 2026 hardware guidance lists gigabit networking as the typical and suggested level for modern workstations and scales server and storage requirements based on workstation count.

Plan MySQL or MariaDB, the database server, OpenDentImages, workstation count, storage, network, backup, and future growth.

Related: Open Dental support

Server or cloud?

Don’t choose based on which word sounds newer. Ask what the selected practice-management system requires, where imaging will live, what depends on the local network, what depends on Internet service, what happens when Internet access is unavailable, where backup is stored, and how practice data is recovered.

A cloud practice-management system can reduce some on-premises server requirements. It does not eliminate reliable workstations, business networking, Internet, identity, Microsoft 365, cybersecurity, imaging infrastructure, or backup and recovery planning.

Related: Dental practice server replacement · Dental backup and disaster recovery

Design the cabling before drywall

This is one of the highest-value parts of an IT buildout. Plan network runs for the front desk, every operatory, imaging, CBCT, scanners, printers, VoIP phones, wireless access points, consultation areas, displays where needed, the network room, and future equipment.

Do not build a modern dental practice around the assumption that every device can simply use Wi-Fi.

Use structured cabling

For a new build, use professionally installed structured cabling appropriate to the project, generally Cat6 or Cat6A-class infrastructure depending on design, distance, expected equipment, and project requirements. The category printed on the cable is not the whole job. Every permanent run should be terminated properly, tested, labeled, and documented.

Label every cable

Five years from now, nobody should have to guess which of 40 cables goes to Operatory 3. Label both ends and document the patch panel.

  • FRONT-01
  • FRONT-02
  • OP1-A
  • OP1-B
  • OP2-A
  • OP2-B
  • CBCT-01
  • SCAN-01
  • AP-WEST
  • AP-EAST
  • PRINTER-ADMIN

Plan additional capacity

Don’t build the communications infrastructure with every port occupied on opening day. Allow for additional operatories, extra access points, additional phones, imaging expansion, new clinical equipment, and cameras or other future systems where appropriate. The practice will change. The infrastructure should leave room for it.

Related: Dental office network and Wi-Fi

Build a proper network room

The network closet is not leftover storage space. It may contain Internet equipment, the firewall, switches, patch panels, a UPS, server or storage, and phone equipment. Plan adequate power, ventilation, physical security, equipment access, cable management, rack space, and battery protection.

Avoid placing critical equipment somewhere exposed to water, excessive heat, accidental unplugging, storage clutter, or unrestricted public access.

Business-grade firewall

The firewall can manage Internet access, network segmentation, VPN, remote access, security policies, Internet failover, and logging. Use a supported business platform that can be securely administered, updated, monitored, backed up, and documented. Do not make an ISP-supplied consumer router the entire network and security architecture.

Managed switches

Switches connect the office. A managed environment can provide monitoring, VLANs, PoE, troubleshooting, port visibility, and configuration control. Choose capacity for opening day plus expected growth, rather than exactly today’s port count.

Wired where practical

Fixed clinical equipment generally benefits from wired networking where practical: servers, front-desk PCs, operatory workstations, CBCT, imaging workstations, and network printers. Wi-Fi remains useful for mobile devices, laptops, tablets, and patient Internet access.

Open Dental’s current hardware guidance lists 1000 Mbps networking for its typical and suggested new workstation configurations. Use wired and wireless intentionally rather than making everything wireless because it is convenient during construction.

Business-grade Wi-Fi

Plan Wi-Fi based on the building: layout, walls, equipment, neighboring wireless networks, user density, access-point placement, roaming, and guest-device volume. Do not assume one powerful access point covers 5,000 square feet. Coverage and capacity are not the same thing. A wireless site survey is preferable where reliable wireless performance matters.

Separate guest Wi-Fi

Patient phones and visitor devices should not have unrestricted access to internal practice systems. Design guest connectivity to provide Internet access without unnecessary access to servers, workstations, printers, imaging, or network-management systems. Use appropriate network segmentation.

Plan Internet early

Internet should be treated as a construction dependency. Business installations can require site surveys, conduit, demarc extension, construction, static-IP provisioning, and carrier scheduling. Order early enough that an ISP delay doesn’t become an opening delay.

Document the provider, circuit, account number, authorized contacts, bandwidth, static IP, installation date, demarc location, and support number.

Consider backup Internet

For a heavily cloud-dependent practice, evaluate an independent second connection: fiber plus cable, two independent wired carriers, or cellular failover. The value depends on cloud dependency, outage history, provider diversity, production impact, and monthly cost. Don’t add a second ISP simply because it sounds resilient. Determine whether it materially changes the practice’s failure path.

Backup power doesn’t guarantee Internet

A UPS, generator, or solar system can keep equipment inside the practice powered. It cannot power the ISP’s upstream infrastructure or the cellular carrier network. Meaningful continuity can require diversity across power, carriers, and communications paths, not simply a bigger UPS.

UPS protection

Provide appropriate battery protection for the firewall, switches, server, storage, and ISP equipment. Open Dental recommends UPS protection for systems running MySQL or MariaDB to help prevent data problems caused by abrupt power interruption. Patterson Dental also recommends battery backup for Eaglesoft servers, with testing or inspection semiannually. UPS equipment should itself have a lifecycle and battery-maintenance plan.

Create workstation standards

Don’t buy computers one at a time from whichever listing is cheapest that week. Create standards based on clinical role. A front-desk workstation typically runs practice management, email, insurance, patient communication, Microsoft 365, and payment systems. An operatory workstation typically runs practice management, charting, imaging, sensors, and clinical applications. An imaging workstation may need to handle CBCT, rendering, image acquisition, scanners, and vendor software, which can require different CPU, memory, GPU, USB, or storage. Administration workstations typically run Microsoft 365, management, accounting, analytics, and reporting.

Don’t size new PCs only to minimum requirements

Minimum specifications answer whether the application will run. The more useful design question is whether the workstation will handle the practice’s real workflow for its intended service life. Plan for practice management, imaging, browser applications, Microsoft 365, endpoint security, remote management, and future application growth.

Record the hardware lifecycle from day one

For every system, record the make and model, serial number, purchase date, warranty expiration, location, user, role, and operating system. A new practice is the easiest moment to create a clean technology inventory. Don’t wait five years to reconstruct it.

Set up Microsoft 365 under practice ownership

Create Microsoft 365 in a way the practice ultimately controls. Document the tenant, domain, billing ownership, licenses, Global Administrators, MFA, shared mailboxes, security policies, and DNS. The IT provider may administer the tenant. The practice should not become dependent on one outside person to control its identity platform.

Use individual identities

Where systems support it, give employees individual accounts. Avoid treating frontdesk, office, hygiene, or admin as shared identities used by multiple people. Individual identities improve accountability, MFA, onboarding, offboarding, access management, and auditing. Shared mailboxes can still provide common addresses without shared login credentials.

Establish onboarding before employees start

Define how a new employee receives a workstation, email, Microsoft 365, MFA, practice-management access, imaging access, shared resources, printer access, and a phone. By opening day, onboarding should already be a repeatable process.

Define offboarding too

Before the first employee leaves, define how access will be removed from Microsoft 365, practice management, VPN, the workstation, remote access, financial systems, shared credentials, administrator rights, and MFA registrations. Building the process before it is needed reduces forgotten access later.

Cybersecurity begins before opening day

Do not wait until after opening to add security. Before clinical operations begin, establish the baseline: endpoint protection, remote monitoring, patching, MFA, encryption where appropriate, email security, the firewall, administrative-account controls, secure remote access, a vendor-access review, backup, and monitoring.

The goal is that every production workstation begins its life known, managed, and protected.

Security-pending devices shouldn’t become invisible

Known equipment, managed equipment, and security-protected equipment should be the same population. If the practice owns 25 computers and the security console contains 21 endpoints, investigate the missing four.

Related: Cybersecurity for dental practices

Plan backup before patient data exists

This is non-negotiable from an operational standpoint. Identify the practice-management database, imaging, scanned documents, shared practice files, server data, and cloud data that needs a separate recovery path. Then establish backup frequency, retention, encryption, an offsite or isolated recovery copy, monitoring, recovery credentials, and the recovery process.

Open Dental backup example

For an Open Dental environment, current documentation identifies the database and the OpenDentImages, or A-to-Z, folders as data that needs backup consideration. Open Dental recommends at least daily backups, encrypted storage, and regular restore testing, and explicitly states that RAID should not be treated as a backup or disaster-recovery solution.

Its supplemental backup system is described as a last-resort option, not a replacement for primary backup, because supplemental copies are not verified and do not include OpenDentImages. That is why the IT provider needs to understand the actual application architecture rather than simply saying the server is backed up.

Test recovery before opening

Where practical, perform a controlled recovery validation before the practice has months of patient history. Verify recovery credentials, backup accessibility, the database, imaging, files, the restoration process, and an approximate recovery time. Open Dental specifically recommends verifying backup quality by restoring to another secured machine rather than assuming that a successful backup job proves recoverability.

Related: Dental backup and disaster recovery

Phones, printers, and payment systems

Phones and VoIP

Treat phones as part of the network architecture. Plan the provider, phone numbers, extensions, front-desk flow, voicemail, after-hours routing, e-fax where applicable, and emergency routing. VoIP depends on the network, the firewall, Internet, and power. Coordinate those dependencies.

Printers and scanners

Map the administrative printer, front-desk printers, label printers, document scanners, multifunction devices, and specialty clinical printing. Document the network location, IP address, driver, scan destinations, and vendor support. Avoid creating a collection of unrelated wireless printers as needs appear.

Payment systems

Coordinate with the payment vendor early. Determine workstation integration, network requirements, Internet requirements, terminal connectivity, and security responsibilities. Do not let the payment company redesign the practice network simply for deployment convenience.

Vendor coordination is part of the project

A new practice may involve a general contractor, a low-voltage contractor, an ISP, a phone provider, a practice-management vendor, an imaging vendor, a CBCT vendor, a scanner vendor, a payment provider, and an IT company. Create one dependency table. Someone has to coordinate the dependencies. Ideally, that isn’t the dentist spending evenings translating between five support desks.

Vendor responsibilities and IT dependencies for a new dental office
VendorResponsibilityIT dependency
ISPInternetDemarc and firewall
PMSPractice managementServer and network
ImagingImagingPC, network, and storage
CBCTAcquisitionPC and network
PhonesVoiceInternet and network

A practical 120-day buildout timeline

120+ days before opening: Architecture

  • PMS
  • Imaging
  • CBCT and scanners
  • Server or cloud design
  • Floor-plan technology
  • Internet
  • Phone strategy

Deliverable: Dental Technology Plan

90–120 days: Construction design

  • Structured cabling design
  • Network-room design
  • Rack and power
  • Access-point locations
  • Operatory drops
  • Imaging requirements
  • ISP demarc

Deliverable: Begin procurement planning

60–90 days: Infrastructure

  • Cabling
  • Rack
  • Patch panels
  • Firewall
  • Switches
  • Wi-Fi
  • Internet

Deliverable: Begin the domain, Microsoft 365, and identity setup

30–60 days: Systems

  • Server or required infrastructure
  • Workstations
  • Microsoft 365
  • Remote management
  • Security tools
  • Backup
  • Phones
  • Printers

Deliverable: Coordinate vendor installations

14–30 days: Dental systems

  • PMS
  • Imaging
  • CBCT
  • Scanners
  • Sensors
  • Payment systems
  • Printers
  • Other integrations

Deliverable: Early workflow testing

7–14 days: Full-system testing

  • Scheduling
  • Chart access
  • Imaging and sensors
  • CBCT
  • Scanner
  • Printing
  • Payments
  • Calls
  • Email
  • Backup

Deliverable: A mock patient day, not a power-on test

Conduct a mock patient day

Before opening, simulate the clinical workflow. The test is not whether a computer boots. The first real patient should not also become the first full integration test.

Front desk

  • Create a test patient
  • Schedule
  • Check in
  • Scan a document
  • Print
  • Payment workflow

Operatory and imaging

  • Open the chart
  • Document treatment
  • Retrieve images
  • Acquire a test image when appropriate
  • Confirm acquisition, storage, and retrieval

Business systems and recovery

  • Email
  • Phones
  • Printing
  • Shared resources
  • Confirm the latest backup

Opening-day support plan

Document the IT contact, escalation number, practice-management vendor, imaging vendor, CBCT vendor, Internet provider, and phone provider. Define what is critical (the practice cannot operate), high (a major clinical workflow is impacted), and normal (a workflow inconvenience).

Opening day should be about supporting operations, not installing unfinished infrastructure.

30-day post-opening review

Real clinical workload reveals things testing sometimes doesn’t. At roughly 30 days, review help-desk patterns, Wi-Fi, workstations, imaging, practice management, the network, Internet, phones, backup, cybersecurity, and vendor issues.

Then distinguish a defect, something that isn’t operating as designed, from an optimization, something that works but could improve, and from a future project, something useful but unnecessary for current operations.

New Dental Office IT Checklist

Use this as the project reference. The tracker at the top of the page is the short version you can mark as you go.

Planning

  • PMS selected
  • Imaging selected
  • CBCT and scanner requirements known
  • Floor plan reviewed by IT
  • Server or cloud architecture decided
  • Internet ordered
  • Phone architecture decided
  • Opening timeline documented

Construction

  • Network room located
  • Rack planned
  • Power planned
  • UPS planned
  • Cabling plan
  • Operatory network drops
  • Imaging drops
  • Access-point drops
  • Future capacity
  • Cable testing
  • Cable labeling

Network

  • Business firewall
  • Managed switches
  • Business Wi-Fi
  • Guest Wi-Fi isolation
  • Network segmentation where appropriate
  • Internet configured
  • Failover decision
  • Monitoring
  • Network documentation

Computers

  • Front-desk standard
  • Operatory standard
  • Imaging standard
  • Administration standard
  • Device inventory
  • Warranty information
  • Supported operating systems

Dental systems

  • PMS installed
  • Imaging installed
  • CBCT installed
  • Sensors installed
  • Scanners installed
  • Bridges and integrations tested
  • Vendor escalation documented

Microsoft 365

  • Tenant owned by the practice
  • Domain controlled
  • Users created
  • Licensing
  • MFA
  • Global Administrators documented
  • Email security
  • Onboarding and offboarding process

Cybersecurity

  • Remote monitoring
  • Endpoint protection
  • Patching
  • Encryption where appropriate
  • Firewall
  • Remote-access policy
  • Vendor-access review
  • Administrator controls

Backup and recovery

  • PMS data protected
  • Imaging protected
  • Files protected
  • Secure offsite or isolated copy
  • Retention defined
  • Encryption
  • Monitoring
  • Restore tested
  • Recovery contacts defined

Opening readiness

  • Every operatory tested
  • Front desk tested
  • PMS tested
  • Imaging tested
  • CBCT tested
  • Scanner tested
  • Printers tested
  • Phones tested
  • Internet tested
  • Failover tested where installed
  • Backup verified
  • Escalation contacts distributed

Common new-office IT mistakes

Waiting until construction is nearly finished. By then, cabling, rack location, electrical, and operatory decisions may already be expensive to change.

Under-cabling the office, so everything becomes unnecessarily dependent on Wi-Fi. Buying computers before choosing dental software, so hardware is selected without vendor requirements. Letting every vendor design independently, so each product works alone while the whole environment doesn’t.

Using consumer network equipment, so the practice quickly outgrows visibility, segmentation, and management. Leaving cybersecurity until later, so opening day begins with unmanaged devices. Treating RAID as backup, and confusing hardware redundancy with recoverability.

Letting outside vendors own critical accounts, so the practice later struggles to control its own domain, Microsoft 365, backup, or Internet accounts. Discovering imaging requirements too late. Never testing the complete workflow, so every vendor can say their part works while nobody has proved the practice works.

Who should own the technology?

By the end of the project, the practice should ultimately control its critical business assets. That includes appropriate ownership and access for the domain, DNS, Microsoft 365, the Internet account, the phone account, backup, administrator credentials, and dental-software vendor accounts.

323 Technologies can manage those systems without making the practice dependent on 323 Technologies to retain ownership of them. The practice should not depend on one technician remembering everything.

Documentation delivered at project completion

A well-built practice should have a usable technology record.

Network

  • Diagram
  • Firewall
  • Switches
  • Access points
  • VLANs
  • ISP details
  • IP plan

Devices, software, vendors, and recovery

  • Server, workstations, and imaging systems
  • Warranties and serial numbers
  • Practice management, imaging, backup, and Microsoft 365
  • Vendor companies, products, support contacts, and account information
  • Backup architecture, restore process, and escalation

How much does a dental office IT buildout cost?

There is no honest single number without knowing the project. Major cost categories include cabling, the rack, patch panels, testing, and labor; the firewall, switches, access points, and UPS; workstations for the front desk, operatories, administration, and imaging; server or storage where the application architecture requires it; Microsoft 365, security, backup, and remote management; and the design, configuration, installation, integration, vendor coordination, testing, and documentation.

The quote should separate what is required for opening, what is recommended for resilience, and what is future growth. That lets ownership make an informed capital decision.

Don’t overspend either

A serious dental IT company shouldn’t use a new build as an excuse to maximize the equipment list. Don’t install an unnecessary physical server, oversize the firewall without a reason, install access points without designing Wi-Fi, replace vendor-supplied equipment simply for standardization, or purchase premium hardware where the workload doesn’t benefit.

Invest where it materially improves reliability, security, recoverability, supportability, clinical workflow, and lifecycle value.

Related: How to choose a dental IT company · Opening a second dental location

How 323 Technologies approaches new dental office buildouts

One technology plan

Instead of planning each technology separately, 323 Technologies evaluates the floor plan, dental software, imaging, network, Internet, workstations, Microsoft 365, cybersecurity, and backup and recovery as one operating environment.

Dental-specific coordination

Dentrix, Eaglesoft, Open Dental, DEXIS, CBCT, scanners, and 3Shape depend on the network, computers, server or cloud infrastructure, and the vendors around them. We work alongside ownership, the general contractor, the low-voltage contractor, the ISP, the phone provider, and the software and equipment vendors.

Test the practice, not just the equipment

The project isn’t finished simply because every device powers on. The goal is a tested clinical workflow.

Already operating and want a readiness review instead of a buildout plan? Take the Dental IT readiness assessment. For the broader practice, start with Dental IT support.

Opening a practice

Opening a dental practice in Dallas–Fort Worth?

Get IT involved while the floor plan and infrastructure can still be changed easily.

323 Technologies can help plan the network, Internet, computers, dental systems, Microsoft 365, cybersecurity, backup, vendor coordination, and opening-day testing around your actual practice.

Supporting new and growing dental practices throughout Dallas–Fort Worth and beyond.

Or call (817) 674-7037

Questions about a new dental office

When should IT get involved in a new dental office?

Ideally during floor-plan and early construction planning, before cabling, electrical, equipment placement, and network-room decisions become difficult to change.

Does a new dental practice need a server?

Not automatically. The answer depends on the practice-management platform, imaging architecture, integrations, and other clinical applications.

What Internet speed does a new dental office need?

There isn’t one universal number. Make the decision based on PMS architecture, imaging and cloud workflows, Microsoft 365, VoIP, backup, staff count, and redundancy needs.

Should dental operatories use Wi-Fi?

Fixed operatory workstations generally benefit from wired Ethernet where practical. Wireless remains useful for genuinely mobile devices.

Does Dentrix require gigabit networking?

Current Dentrix 2026 system requirements specify 1 Gbps networking for servers and workstations.

What networking does Open Dental recommend?

Current Open Dental hardware guidance lists 1000 Mbps networking for typical and suggested new configurations.

Does Eaglesoft require a dedicated server?

Current Patterson Dental guidance recommends a dedicated Eaglesoft server for six or more workstations, with architecture requirements increasing for larger environments.

Should backups be running before opening?

Yes. Production patient data shouldn’t begin accumulating before a defined backup and recovery process exists.

Should the backup be tested before opening?

Where practical, yes. A verified restoration process gives stronger evidence of recoverability than an automated “backup successful” message.

Should we have two Internet providers?

It depends on the practice’s reliance on cloud and Internet services, outage risk, carrier diversity, and the financial impact of downtime. A dental office that cannot operate without Internet has a different resilience requirement from one whose critical clinical systems remain local.

Who should own Microsoft 365 and the domain?

The business should retain ultimate ownership and administrative continuity over critical business assets. The IT provider can administer those assets on behalf of the practice.

This guide is general planning information, not construction, electrical, legal, or compliance advice. Dentrix, Eaglesoft, Open Dental, and imaging requirements change by vendor and version. Confirm the current requirements for the exact release you will install before purchasing hardware.